|
|
|
98279 zł
|
|
price without VAT: 79901,63 zł
|
| |
Shop online:
● on request
Shop in Warsaw (qty):
● on request
Shop in Chorzow (qty):
● on request
|
|
The dome is made of a 5 mm thick polyester-glass laminate, which provides full resistance to weather conditions, while guaranteeing high durability and aesthetics. Additionally, it is reinforced with embossments placed on the outside of the sphere and special reinforcements embedded inside the structure.
The dome consists of 7 basic elements, which greatly facilitates assembly on tall buildings and transport.
The tightness of the dome is guaranteed by a special construction of the connections of the elements, preventing water from getting inside the sphere. A large gap at the base and the light color of the coating prevent excessive heating of the dome. A large, one-meter-wide, lockable observation window embedded in the outline of the sphere allows for free observations, both visual and with the help of telescopes with a diameter of up to 90 cm.
The observation window was designed so that the telescope would have a free view of the zenith. The rotation of the dome is provided by a track placed in the base of the ball, it rolls on it guided by a set of 16 plastic rollers.
All manufactured domes are assembled at the factory and then disassembled and prepared for transport.
• dome diameter: 3000 mm • flap width: 1000 mm • dome height: 2400 mm • Base diameter: 2760 mm • dome weight (including pallet): approx. 350 kg • full rotation of the dome with automation system: ~70 seconds • power consumption (230VAC): ~ 450W average (both motors working), ~ 250W (opening the blinds) ~ 600W max. (at start-up) • rotary drive • shutter drive • PlugAndPlay cabling • 2x Arduino ScopeDome board control system • electronics and engines Heating system determined individually, depending on the specifics of the dome installation location We can deliver the dome within approximately 14 days of placing the order The dome and control system are covered by a 1 (one) year warranty

After preliminary arrangements have been made regarding the selection of the site for erecting the dome, the dome can be ready for use within a few days.  Day 1 Preparing the area for the screed
|  Day 2 Formwork and concrete pouring
|  Day 3 Day off work - waiting for the concrete to set
|  Day 4 Transporting the dome
|  Day 4 We place the base of the dome on the screed
|  Day 4 A crane is not always needed to move a dome
|  Day 4 We put the dome on the base
|  The end result - the dome on a sunny day
|
|